Tahkoluoto offshore wind power project

Hyötytuuli Oy /Tahkoluodon merituulipuisto
10
pcs
90
m
130
m
4,2
MW

Suomen Hyötytuuli Oy will build 10 offshore wind turbines outside Tahkoluoto in Pori. The offshore wind turbines are designed around Finland’s first offshore wind turbine, which was completed in 2010. The offshore wind turbines will increase the size of our existing Reposaari wind farm.

Wind power production is expected to keep expanding to the sea due to better wind conditions and the possibility of building large-scale offshore wind farms.

Studies carried out by Suomen Hyötytuuli indicate that the project is feasible in terms of its technical requirements. The area has an excellent infrastructure and wind conditions for wind power production.

Permit procedure

The EIA procedure for the project was completed in 2007. The results of the environmental impact assessment have been utilised in the design and land use planning of the project. The EIA documents (only in Finnish) can be viewed through the following link:

Suomen Hyötytuuli Oy’s offshore wind farm, Tahkoluoto in Pori

The land use planning of the offshore wind farm has been accepted in August 2015. The planning material (only in Finnish) can be viewed through the following link:

Tahkoluoto offshore wind farm

Energy Production

Nikkarinkaarto wind farm

10 pcs / 3,45 MW

Wind farm's current production 6.17 MW

Kuljunniemi wind farm in Raahe

9 pcs / 2,3 MW

Wind farm's current production 4.31 MW

Reposaari wind farm

11 pcs / 1-3,3 MW

Wind farm's current production 5.15 MW