Alajoki-Peuralinna wind farm project

14
pcs
240
m
158
m
6
MW

Suomen Hyötytuuli Oy is planning a wind farm of seven wind turbines in the municipality of Perho.

Perho is located in the province of South Ostrobothnia. The wind farm will be located in the area of Alajoki in the south-west part of Perho, at a distance of seven kilometres from the town centre.

Suomen Hyötytuuli is also planning a Peuralinna wind farm of seven turbines in the municipality of Kyyjärvi.

The land use plan and building permits of 14 turbines in Alajoki-Peuralinna wind farm have legal force.

Investmentdecision was made in September 2020 and construction work will start in 2021. The wind farm is expected to reach full operations in 2022.

Energy Production

Jokela wind farm

12 pcs / 3,0 MW

Wind farm's current production 36.23 MW

Annankangas wind farm

10 pcs / 3,45 MW

Wind farm's current production 33.93 MW

Kuljunniemi wind farm

9 pcs / 2,3 MW

Wind farm's current production 19.63 MW

Nikkarinkaarto wind farm

10 pcs / 3,45 MW

Wind farm's current production 31.28 MW

Reposaari wind farm

10 pcs / 1-3,3 MW

Wind farm's current production 10.56 MW

Tahkoluoto offshore wind farm

11 pcs / 2,3-4,2 MW

Wind farm's current production 29.74 MW