{"id":3801,"date":"2021-03-18T09:55:48","date_gmt":"2021-03-18T07:55:48","guid":{"rendered":"https:\/\/hyotytuuli.fi\/perhon-kokkonevan-tuulivoimahankkeen-kaavoitus-ja-ymparistovaikutusten-arviointimenettely-kaynnistetaan\/"},"modified":"2021-03-18T09:55:48","modified_gmt":"2021-03-18T07:55:48","slug":"zoning-and-environmental-impact-assessment-processes-for-perhos-kokkoneva-wind-farm-project-are-due-to-begin","status":"publish","type":"post","link":"https:\/\/hyotytuuli.fi\/en\/zoning-and-environmental-impact-assessment-processes-for-perhos-kokkoneva-wind-farm-project-are-due-to-begin\/","title":{"rendered":"Zoning and environmental impact assessment processes for Perho\u2019s Kokkoneva wind farm project are due to begin"},"content":{"rendered":"<p>Suomen Hy\u00f6tytuuli will present its plans for Kokkoneva on 22 March 2021 at 6:30 p.m. at Perho\u2019s local council meeting. The presentation will be streamed and can be watched at: https:\/\/www.nopolanews.fi\/nopola-news-air-kanava-1<br \/>\nSuomen Hy\u00f6tytuuli is planning a wind farm in Kokkoneva, Perho, Central Ostrobothnia. The planned wind farm area is located northeast of the village of Oksakoski, just over three kilometres northwest of the Perho town centre. The total area is approximately 3,000 hectares. The regional land use plan for Central Ostrobothnia designates the area as a wind farm area.<br \/>\nThe wind farm planned for the Kokkoneva area will consist of up to 38\u201345 wind turbines with a height of up to 300 metres and a unit capacity of about 6\u201310 MW. The estimated total capacity of the wind farm is 270\u2013380 megawatts. According to preliminary plans, the construction of the wind farm will take place in 2025\u20132026.<br \/>\nAt a meeting on 15 March, Perho&#8217;s local council decided to start preparing a legally effective component master plan for the Kokkoneva wind farm and to conclude a zoning agreement with Suomen Hy\u00f6tytuuli. A participation and evaluation plan for the project should be completed later this spring. The suitability of the Kokkoneva area for wind power production will be assessed on the basis of the component master plan and the environmental impact assessment (EIA).<br \/>\nHy\u00f6tytuuli is currently building the Alajoki-Peuralinna wind farm near Kokkoneva. A total of 14 turbines will be built in Alajoki, Perho, and in Peuralinna, Kyyj\u00e4rvi, where groundwork has already begun.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Suomen Hy\u00f6tytuuli will present its plans for Kokkoneva on 22 March 2021 at 6:30 p.m. at Perho\u2019s local council meeting. The presentation will be streamed and can be watched at: https:\/\/www.nopolanews.fi\/nopola-news-air-kanava-1 Suomen Hy\u00f6tytuuli is planning a wind farm in Kokkoneva, Perho, Central Ostrobothnia. The planned wind farm area is located northeast of the village of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[35],"tags":[],"class_list":["post-3801","post","type-post","status-publish","format-standard","hentry","category-general"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Zoning and environmental impact assessment processes for Perho\u2019s Kokkoneva wind farm project are due to begin - Hy\u00f6tytuuli<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/hyotytuuli.fi\/en\/zoning-and-environmental-impact-assessment-processes-for-perhos-kokkoneva-wind-farm-project-are-due-to-begin\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Zoning and environmental impact assessment processes for Perho\u2019s Kokkoneva wind farm project are due to begin - Hy\u00f6tytuuli\" \/>\n<meta property=\"og:description\" content=\"Suomen Hy\u00f6tytuuli will present its plans for Kokkoneva on 22 March 2021 at 6:30 p.m. at Perho\u2019s local council meeting. The presentation will be streamed and can be watched at: https:\/\/www.nopolanews.fi\/nopola-news-air-kanava-1 Suomen Hy\u00f6tytuuli is planning a wind farm in Kokkoneva, Perho, Central Ostrobothnia. The planned wind farm area is located northeast of the village of [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/hyotytuuli.fi\/en\/zoning-and-environmental-impact-assessment-processes-for-perhos-kokkoneva-wind-farm-project-are-due-to-begin\/\" \/>\n<meta property=\"og:site_name\" content=\"Hy\u00f6tytuuli\" \/>\n<meta property=\"article:published_time\" content=\"2021-03-18T07:55:48+00:00\" \/>\n<meta name=\"author\" content=\"mscadmin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"mscadmin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/hyotytuuli.fi\\\/en\\\/zoning-and-environmental-impact-assessment-processes-for-perhos-kokkoneva-wind-farm-project-are-due-to-begin\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/hyotytuuli.fi\\\/en\\\/zoning-and-environmental-impact-assessment-processes-for-perhos-kokkoneva-wind-farm-project-are-due-to-begin\\\/\"},\"author\":{\"name\":\"mscadmin\",\"@id\":\"https:\\\/\\\/hyotytuuli.fi\\\/en\\\/#\\\/schema\\\/person\\\/3c4b9ff19932ba5d289505e9f39abc70\"},\"headline\":\"Zoning and environmental impact assessment processes for Perho\u2019s Kokkoneva wind farm project are due to begin\",\"datePublished\":\"2021-03-18T07:55:48+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/hyotytuuli.fi\\\/en\\\/zoning-and-environmental-impact-assessment-processes-for-perhos-kokkoneva-wind-farm-project-are-due-to-begin\\\/\"},\"wordCount\":269,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/hyotytuuli.fi\\\/en\\\/#organization\"},\"articleSection\":[\"General\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/hyotytuuli.fi\\\/en\\\/zoning-and-environmental-impact-assessment-processes-for-perhos-kokkoneva-wind-farm-project-are-due-to-begin\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/hyotytuuli.fi\\\/en\\\/zoning-and-environmental-impact-assessment-processes-for-perhos-kokkoneva-wind-farm-project-are-due-to-begin\\\/\",\"url\":\"https:\\\/\\\/hyotytuuli.fi\\\/en\\\/zoning-and-environmental-impact-assessment-processes-for-perhos-kokkoneva-wind-farm-project-are-due-to-begin\\\/\",\"name\":\"Zoning and environmental impact assessment processes for Perho\u2019s Kokkoneva wind farm project are due to begin - Hy\u00f6tytuuli\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/hyotytuuli.fi\\\/en\\\/#website\"},\"datePublished\":\"2021-03-18T07:55:48+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/hyotytuuli.fi\\\/en\\\/zoning-and-environmental-impact-assessment-processes-for-perhos-kokkoneva-wind-farm-project-are-due-to-begin\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/hyotytuuli.fi\\\/en\\\/zoning-and-environmental-impact-assessment-processes-for-perhos-kokkoneva-wind-farm-project-are-due-to-begin\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/hyotytuuli.fi\\\/en\\\/zoning-and-environmental-impact-assessment-processes-for-perhos-kokkoneva-wind-farm-project-are-due-to-begin\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/hyotytuuli.fi\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Zoning and environmental impact assessment processes for Perho\u2019s Kokkoneva wind farm project are due to begin\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/hyotytuuli.fi\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/hyotytuuli.fi\\\/en\\\/\",\"name\":\"Hy\u00f6tytuuli\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/hyotytuuli.fi\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/hyotytuuli.fi\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/hyotytuuli.fi\\\/en\\\/#organization\",\"name\":\"Hy\u00f6tytuuli\",\"url\":\"https:\\\/\\\/hyotytuuli.fi\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/hyotytuuli.fi\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/arenso.fi\\\/app\\\/uploads\\\/2025\\\/02\\\/cropped-favicon-1-1.webp\",\"contentUrl\":\"https:\\\/\\\/arenso.fi\\\/app\\\/uploads\\\/2025\\\/02\\\/cropped-favicon-1-1.webp\",\"width\":512,\"height\":512,\"caption\":\"Hy\u00f6tytuuli\"},\"image\":{\"@id\":\"https:\\\/\\\/hyotytuuli.fi\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/hyotytuuli.fi\\\/en\\\/#\\\/schema\\\/person\\\/3c4b9ff19932ba5d289505e9f39abc70\",\"name\":\"mscadmin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/deca10238b1a8aad39b527f26cfe4ce4f9a8affad032c8141ae4471de5fc9fab?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/deca10238b1a8aad39b527f26cfe4ce4f9a8affad032c8141ae4471de5fc9fab?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/deca10238b1a8aad39b527f26cfe4ce4f9a8affad032c8141ae4471de5fc9fab?s=96&d=mm&r=g\",\"caption\":\"mscadmin\"},\"sameAs\":[\"https:\\\/\\\/hyotytuuli.fi\\\/wp\"],\"url\":\"https:\\\/\\\/hyotytuuli.fi\\\/en\\\/author\\\/mscadmin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Zoning and environmental impact assessment processes for Perho\u2019s Kokkoneva wind farm project are due to begin - Hy\u00f6tytuuli","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/hyotytuuli.fi\/en\/zoning-and-environmental-impact-assessment-processes-for-perhos-kokkoneva-wind-farm-project-are-due-to-begin\/","og_locale":"en_US","og_type":"article","og_title":"Zoning and environmental impact assessment processes for Perho\u2019s Kokkoneva wind farm project are due to begin - Hy\u00f6tytuuli","og_description":"Suomen Hy\u00f6tytuuli will present its plans for Kokkoneva on 22 March 2021 at 6:30 p.m. at Perho\u2019s local council meeting. The presentation will be streamed and can be watched at: https:\/\/www.nopolanews.fi\/nopola-news-air-kanava-1 Suomen Hy\u00f6tytuuli is planning a wind farm in Kokkoneva, Perho, Central Ostrobothnia. The planned wind farm area is located northeast of the village of [&hellip;]","og_url":"https:\/\/hyotytuuli.fi\/en\/zoning-and-environmental-impact-assessment-processes-for-perhos-kokkoneva-wind-farm-project-are-due-to-begin\/","og_site_name":"Hy\u00f6tytuuli","article_published_time":"2021-03-18T07:55:48+00:00","author":"mscadmin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"mscadmin","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/hyotytuuli.fi\/en\/zoning-and-environmental-impact-assessment-processes-for-perhos-kokkoneva-wind-farm-project-are-due-to-begin\/#article","isPartOf":{"@id":"https:\/\/hyotytuuli.fi\/en\/zoning-and-environmental-impact-assessment-processes-for-perhos-kokkoneva-wind-farm-project-are-due-to-begin\/"},"author":{"name":"mscadmin","@id":"https:\/\/hyotytuuli.fi\/en\/#\/schema\/person\/3c4b9ff19932ba5d289505e9f39abc70"},"headline":"Zoning and environmental impact assessment processes for Perho\u2019s Kokkoneva wind farm project are due to begin","datePublished":"2021-03-18T07:55:48+00:00","mainEntityOfPage":{"@id":"https:\/\/hyotytuuli.fi\/en\/zoning-and-environmental-impact-assessment-processes-for-perhos-kokkoneva-wind-farm-project-are-due-to-begin\/"},"wordCount":269,"commentCount":0,"publisher":{"@id":"https:\/\/hyotytuuli.fi\/en\/#organization"},"articleSection":["General"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/hyotytuuli.fi\/en\/zoning-and-environmental-impact-assessment-processes-for-perhos-kokkoneva-wind-farm-project-are-due-to-begin\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/hyotytuuli.fi\/en\/zoning-and-environmental-impact-assessment-processes-for-perhos-kokkoneva-wind-farm-project-are-due-to-begin\/","url":"https:\/\/hyotytuuli.fi\/en\/zoning-and-environmental-impact-assessment-processes-for-perhos-kokkoneva-wind-farm-project-are-due-to-begin\/","name":"Zoning and environmental impact assessment processes for Perho\u2019s Kokkoneva wind farm project are due to begin - Hy\u00f6tytuuli","isPartOf":{"@id":"https:\/\/hyotytuuli.fi\/en\/#website"},"datePublished":"2021-03-18T07:55:48+00:00","breadcrumb":{"@id":"https:\/\/hyotytuuli.fi\/en\/zoning-and-environmental-impact-assessment-processes-for-perhos-kokkoneva-wind-farm-project-are-due-to-begin\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/hyotytuuli.fi\/en\/zoning-and-environmental-impact-assessment-processes-for-perhos-kokkoneva-wind-farm-project-are-due-to-begin\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/hyotytuuli.fi\/en\/zoning-and-environmental-impact-assessment-processes-for-perhos-kokkoneva-wind-farm-project-are-due-to-begin\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/hyotytuuli.fi\/en\/"},{"@type":"ListItem","position":2,"name":"Zoning and environmental impact assessment processes for Perho\u2019s Kokkoneva wind farm project are due to begin"}]},{"@type":"WebSite","@id":"https:\/\/hyotytuuli.fi\/en\/#website","url":"https:\/\/hyotytuuli.fi\/en\/","name":"Hy\u00f6tytuuli","description":"","publisher":{"@id":"https:\/\/hyotytuuli.fi\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/hyotytuuli.fi\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/hyotytuuli.fi\/en\/#organization","name":"Hy\u00f6tytuuli","url":"https:\/\/hyotytuuli.fi\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/hyotytuuli.fi\/en\/#\/schema\/logo\/image\/","url":"https:\/\/arenso.fi\/app\/uploads\/2025\/02\/cropped-favicon-1-1.webp","contentUrl":"https:\/\/arenso.fi\/app\/uploads\/2025\/02\/cropped-favicon-1-1.webp","width":512,"height":512,"caption":"Hy\u00f6tytuuli"},"image":{"@id":"https:\/\/hyotytuuli.fi\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/hyotytuuli.fi\/en\/#\/schema\/person\/3c4b9ff19932ba5d289505e9f39abc70","name":"mscadmin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/deca10238b1a8aad39b527f26cfe4ce4f9a8affad032c8141ae4471de5fc9fab?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/deca10238b1a8aad39b527f26cfe4ce4f9a8affad032c8141ae4471de5fc9fab?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/deca10238b1a8aad39b527f26cfe4ce4f9a8affad032c8141ae4471de5fc9fab?s=96&d=mm&r=g","caption":"mscadmin"},"sameAs":["https:\/\/hyotytuuli.fi\/wp"],"url":"https:\/\/hyotytuuli.fi\/en\/author\/mscadmin\/"}]}},"_links":{"self":[{"href":"https:\/\/hyotytuuli.fi\/en\/wp-json\/wp\/v2\/posts\/3801","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hyotytuuli.fi\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hyotytuuli.fi\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hyotytuuli.fi\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hyotytuuli.fi\/en\/wp-json\/wp\/v2\/comments?post=3801"}],"version-history":[{"count":0,"href":"https:\/\/hyotytuuli.fi\/en\/wp-json\/wp\/v2\/posts\/3801\/revisions"}],"wp:attachment":[{"href":"https:\/\/hyotytuuli.fi\/en\/wp-json\/wp\/v2\/media?parent=3801"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hyotytuuli.fi\/en\/wp-json\/wp\/v2\/categories?post=3801"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hyotytuuli.fi\/en\/wp-json\/wp\/v2\/tags?post=3801"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}