Suomen Hyötytuuli invests in Polusjärvi wind farm in Pyhäjoki
Suomen Hyötytuuli Oy has made an investment decision to build a Polusjärvi wind farm in Pyhäjoki, Northern Ostrobothnia. The planned wind farm is l...
Suomen Hyötytuuli Oy has made an investment decision to build a Polusjärvi wind farm in Pyhäjoki, Northern Ostrobothnia. The planned wind farm is l...
A hydraulics component has been damaged in the RE 01 wind turbine located on the causeway to Reposaari and approximately 10 litres of oil was spilled...
Suomen Hyötytuuli Oy has purchased Eranti Engineering Oy’s offshore wind power business. The transaction will ensure the continuity of Eranti Engin...
In 2018, Suomen Hyötytuuli supplied 503,000 MWh of power to its shareholders. The company’s energy production increased by approximately 190,000 MWh...
The operation of the northernmost wind turbine (RE3) of the three turbines located on the Reposaari causeway has been interrupted due to maintenance...
Suomen Hyötytuuli Oy celebrated the world’s first offshore wind farm’s for icy conditions, Tahkoluoto offshore wind farm’s take-over on Thursday 31 Au...
All ten turbines of Tahkoluoto Offshore are now installed, and the sea cable has been laid. Erosion protection of the foundations and the sea cable ar...
Suomen Hyötytuuli Oy builds a wind farm of ten wind turbines at Annankangas in Raahe. The construction shall begin in this autumn, with the aim of com...
You can find out the current project status on a map: https://hyotytuuli.fi/merituulivoima/projektin-tila/. Follow the project also on LinkedIn Follow...