The operation of the wind turbine located on the Reposaari causeway has been interrupted due to main...
Published 15.01.2019
The operation of the northernmost wind turbine (RE3) of the three turbines located on the Reposaari causeway has been interrupted due to maintenance work on the generator. The maintenance work is ant...