Perho Kokkoneva wind farm project
WIND TURBINES
30
pcs
TIP HEIGHT
300
m
Diameter of the rotor
170-200
m
Power / Turbine
6-10
MW
Perho Kokkoneva wind farm project / in development
Suomen Hyötytuuli is planning a wind farm of 30 wind turbines in Kokkoneva, Perho. The height of the wind turbines is maximum of 300 metres and the capacity about 6–10 MW. The wind farm will be constructed between 2025 and 2027.
The municipality of Perho is located in the province of Central Ostrobothnia. The planned area is situated approx. 3 km north of Perho centre. The total area is approximately 3,300 hectares. The regional land use plan for Central Ostrobothnia designates the area as a wind farm area.
The project’s partial master plan has entered into force. The next steps are to apply for building permits for the wind turbines within the project area and to secure the grid connection.

For landowners
Suomen Hyötytuuli invests in long-term cooperation with the landowners of wind farm sites.