Offshore wind power

Offshore wind power

The role of offshore wind power in energy production is gaining more and more importance with the increase in electricity demand and the pressing climate targets of the EU. Suomen Hyötytuuli has been developing offshore wind power for over 20 years and making investments of over 140 million euros. We built Finland’s first offshore wind turbine in Tahkoluoto, Pori and the world’s first offshore wind farm designed for demanding ice conditions. The pilot turbine was completed in 2010 and ten other turbines in 2017.

Tahkoluoto offshore wind farm, Pori

  • Pilot offshore turbine of 2.3 MW
  • 10 offshore turbines of 4.2 MW each
  • Hub height at about 90 metres, rotor diameter 130 metres
  • The average production is 43% of maximum production
  • The estimated yearly production is approx. 155 GWh
  • The patented steel shell structure offshore foundation was developed by Suomen Hyötytuuli
  • Electrical substation on shore


Tahkoluoto Offshore Oy is currently planning the Tahkoluoto offshore wind farm extension project.


Forerunner in offshore wind power

Working in icy conditions and taking into account the effects of frozen sea when planning, constructing and maintaining wind turbines, is in the core of our expertise. Especially at our offshore wind farm on the coast of Pori, the effects of ice can be dramatic because there is no archipelago breaking the masses of ice in front of the turbine.

When planning an offshore wind farm, the effects of the snow and ice load on the structures must be taken into consideration, and the structure must planned accordingly. Our construction schedules take into account the fact that the time-period for full-blown construction work lasts only from spring till autumn when the sea is open. Therefore, it takes two to three open water seasons to build an offshore wind farm. Maintenance work in icy conditions requires careful planning as well. Suitable equipment is needed to reach the turbines when the sea is frozen.

Suomen Hyötytuuli’s own foundation concept

In Tahkoluoto, the bedrock is close to the sea floor, which makes it impossible to use the monopile foundation generally used in offshore wind turbines. Suomen Hyötytuuli uses a new kind of earth-banked foundation for offshore wind turbines which makes use of the mass of the turbines and the foundation. This so called gravity-based foundation makes it possible to build offshore wind turbines on load-bearing sea floor. Additionally, the structure is designed to reduce the pressure and vibration caused by masses of ice: the conical shape steers the ice so that it does not hit the foundation directly.

Ongoing technological progress

Offshore wind power technology is developing at a rapid pace, thanks to great demand and investments. The production capacity of the largest turbines already exceeds twenty MW and the life-cycle reaches as much as 35 years.

The infrastructure at the ports

Offshore wind power projects are demanding for port areas. In the winter, special vessels are required to break the ice, and the port basin has to be kept clear of ice so that vessels can safely leave for maintenance visits. In addition, the port has to have enough areas for pre-assembly and storage during construction and production. Therefore, offshore wind power projects facilitate the development of port infrastructure.

Ajankohtaista